CRITICAL INFRASTRUCTURE IN PLACE, AND GEARING UP FOR DECADES OF PRODUCTION
➣ $600M+ in shafts, hoists, power grid, water treatment, and transport already in place.
Sunshine Mine is already supported by more than $600 million of installed infrastructure, positioning it as one of the best-prepared development assets in North America. Critical systems are in place — shafts, hoists, substations, water pumping stations, and a fully integrated power grid — alongside five miles of underground rail, air, water, and communications.
Since acquiring the mine in 2010, SSMRC has systematically modernized these core systems, ensuring the complex operates to contemporary standards with exceptional reliability. This extensive investment means Sunshine is uniquely positioned to transition quickly and cost-effectively into production, with the heavy lifting of infrastructure already in place.
Subscribe for the latest updates from Sunshine Silver Mining & Refining